Practice: request triage
How Requests Are Reviewed
For the people who run triage. What it should leave behind: Every request gets an answer within five business days. Run it the week before the first weekly triage. It can start before the first quarter, and it is the fastest visible win.
Teaches 08 Request triage and the idea log.
16 slidesDownload the PDF
Where we are and where we want to be.
1Built from an earlier version of this flow, drawn for a ServiceNow team (How are my requests reviewed and categorized? and the small request frames), and doc 08. This version follows the current system.
- 2
Start with the requester's experience, not the process. Most people in the room have been on both sides: the person waiting and the person getting the hallway ask.
The weekly triage review: five outcomes, who is in the room, bugs, and replies.
3Same shape as the earlier flow. One change: "Already on the roadmap" is now its own outcome, so nothing that is already planned gets logged a second time.
- 4
The four definitions from the earlier flow are kept word for word. "Already on the roadmap" is new.
- 5
If the team has no content strategist, the product owner brings partner requests. Keep the meeting short; if a request needs a long discussion, it is probably large or strategic.
- 6
DMV example: "Renewal payments over $500 fail at the last step." It blocks people from finishing, so the technical architect had it fixed that day.
- 7
Full reply templates are in doc 08. Each starts with "Thanks."
Future consideration and the large request intake conversation.
8DMV example: a deputy director asked for a chatbot that answers renewal questions. At Q2 planning the product manager marked it Future consideration: the renewal service and its help content are still changing, so a chatbot built now would be out of date in weeks. The reply said so, and that the team won't follow up.
- 9
The product manager meets the requester before the idea goes in the log, with the UX designer and researcher if possible. The problem underneath is usually smaller or different.
- 10
The original ask: "an online portal for oversize load permits by July." One request, two outcomes. The partner got something useful now and an honest answer about the rest.
Small requests, balancing the work, and the idea log.
11Cards are DMV examples: the sticker request from the Jan 21 triage, the route checklist from the Motor Carrier intake conversation, the address-change link from week 1. The rest are illustrative. Change from the earlier flow: in the ServiceNow version, catalog owners and steering ordered small requests. In the system, the board runs first in, first out; urgency can move a request up, and the product owner owns the share and steps in to change the order. The product manager doesn't plan small requests. If the product manager is ordering the small request board, it has turned into a second roadmap.
- 12
Same three lanes as the earlier flow, with today's owners and names. The defaults are 50/25/25 and change by quarter.
- 13
DMV example: a counter clerk's idea, "show a document checklist before someone comes in for a new license," was logged in January and mined into the Initiative "Single-trip new driver licenses" at Q2 planning.
Practice with a DMV triage review, then rules of thumb.
14Give the room two minutes in pairs. The interesting arguments are usually 3 versus 4, and whether 5 is a no or an idea.
- 15
The sticker request was pulled into the next sprint against the 2-week small request response commitment. The checklist idea was tagged to Goal 2, zero multi-trip experiences.
- 16
Close by naming the first triage review date and who runs it: [date], [product owner].